Views
A team’s Tasks, Issues and Projects pages are views: a layout plus filters, grouping, sorting and the fields to show.
- Layouts: List, Board, Table, Timeline, Calendar and Graph (^K v then l / b / t / r / c / n; Graph is described in Links & the graph). A view remembers its layout.
- Filter builder (^K f). Filter by status, priority, assignees, labels, project, creator, title and dates. Active filters show as chips.
- Group and sub-group by status, priority, assignees, labels or project.
- Sort by several fields at once.
- Display fields. Choose which fields show on each row or card.
- Board drag. Dragging a card to another column changes its status, priority or assignee to match that column.
- Table. One column per display field, with the header pinned while you scroll. Click a column to sort by it; click again to reverse, and a third time to clear. Edit status, priority, assignees, labels and dates right in the cell: arrow keys move between cells, Enter edits, Esc cancels.
- Timeline. Each task or issue is a bar from its start date to its due date; each project runs from its start date to its target date. Drag a bar to move it, or drag either end to change one date. On the keyboard, press Enter on a bar to type the dates. Zoom by week, month or quarter. The amber line is today. Items without dates wait in Unscheduled.
- Open an item and it shows beside the list; the view tabs and the filter row fold away to give the list and the item the room. Close the item to get them back. ^K f closes the item and opens the filter builder.
- Calendar. Tasks and issues on their due day; an item that has a start date runs as a bar from start to due. Month, Week or Agenda (m, w, a), and the Done, Weekends and Projects switches, are saved with the view, so a shared view opens the same for everyone. Month shows three items a day, then “+N more”; Enter on a day lists them all. Drag an item or a bar to move it, or a bar’s end to change one date; on a phone or tablet, press and hold an item, then tap a day. On the keyboard: the calendar opens on today; arrows move between days, PgUp and PgDn go to the same date a month away (a week in Week), t is today, Tab goes into a day’s items, Alt+arrows move an item (a week with up and down), Alt+Shift+arrows move its start and Alt+[ and Alt+] its end (add Shift for a week). In Agenda, arrows move between items, Enter opens one and Alt+arrows move it. Items with no date wait in No date: drag one onto a day, or press Tab from the calendar to reach the list, pick one with the arrows, press Enter, choose a day with the arrows and press Enter. Selected items (x) move together: more than 25 asks first, and the notice offers Undo. Projects shows the start and target dates of the view’s projects. A faint item is the next time a repeating task comes back, and a bell marks your items with a due-date or overdue reminder. Weeks start on Monday. The calendar’s keys are listed under Calendar in ^K ?.
- On a phone a table shows as a list, a timeline as an agenda by month, and a calendar opens on Agenda.
Your view settings are remembered
Section titled “Your view settings are remembered”- termynl remembers how you last set up each view, for you alone: its layout, filters, grouping, sorting and fields. That includes All tasks, My work, the Docs list and the Docs tree’s Sort. It follows you after a refresh and onto your other devices.
- On a view you can’t edit (the built-in one, or someone else’s), your changes stay yours and the view itself never changes for anyone else. The view menu then offers Reset changes, back to the saved view, and Save as view…. Your own views still save themselves as you change them.
- Signing out removes the copy kept in this browser.
Saved views
Section titled “Saved views”- Views appear as tabs. Save the current setup with ^K c v or + view. Your own views save as you change them.
- Personal views are yours alone. Share one and your team sees it as “shared by you”. Only you can edit it.
- The ★ team default is the view everyone lands on. Team admins choose it.
- A team’s Views page lists every view you can see.
screenshot: list view grouped by status (coming soon)
screenshot: board view (coming soon)
screenshot: table view with inline editing (coming soon)
screenshot: timeline grouped by status (coming soon)
screenshot: filter builder and chips (coming soon)
Change several items at once
Section titled “Change several items at once”In any list, board, table or timeline of tasks or issues, select items and change them together.
- Select: press
xon a focused row, or use the check that appears when you point at a row. Shift+Up or Down extends the selection, Shift-click selects a range, Mod+A selects every row in the view. Esc clears. On a phone, choose Select in the view menu and tap rows. - Change: use the bar that appears, or
^Kthens(Status),p(Priority),a(Assignees),l(Tags),m(Move),d(Dates),x(Archive). Del deletes, after asking. - Up to 500 items at once, and 100 for a move. Above 25 items termynl asks first.
- Each item is checked on its own with your permissions. Anything you can’t change is skipped, and the notice names it.
- Undo is in the notice, for everything except move and delete. Deleted items can be restored one at a time.
- Guests can change fields of items shared with them, but not people, and can’t archive, delete or move in bulk.
- Connected AI tools and Tyn can do the same with
update_items, shown as you via the tool. Bulk delete is not available to them.